Building Our Future

We’re thrilled to announce our plans to expand our space, transforming the future of Paws Place Dog Rescue and expanding our capacity to serve. We are at a pivotal moment—our community’s needs are growing, and we’re committed to rising to meet them.

In 2016, we built our current kennel facility with future growth in mind. During the build we poured the footers for a planned 30’ x 40’ storage building. The original design was for an open structure—no water, sewer, on site fire hydrant or HVAC—to protect equipment, crates, and our transport vehicle. Now, that need has expanded. Our dogs require on site fire safety improvements and a storm secure building that serves us better during hurricanes and floods.

Facility Development Plan

  • A two-floor facility featuring an open-concept second floor, designed to allow staging of crates for severe weather emergencies
  • Mini split HVAC for climate control
  • Generator for back up power
  • 1st floor storage for equipment and supplies
  • High-pressure fire hydrant on property
  • Driveway and new building access road improvements for emergency vehicles

Importance

  • Provides a secure staging area when evacuation from the main kennel is required during severe weather.
  • Ensure we can store medications and food in an elevated, climate controlled space away from floor waters
  • Protect staff, volunteers, dogs and valuable equipment during severe events such as fires and hurricanes.
  • Provide much needed storage space for important resources and supplies.
  • Allow for future growth and expansion of Paws Place.

Campaign Team

For more details, reach out to a campaign team member.

Donations can be made in full or in installments.

  • We accept checks, Paypal, Venmo and credit cards.
  • Other donation options: Donor Advised Funds, foundations, Required Minimum Distributions from retirement accounts or stocks.
  • Utilize Matching Funds from your employer (if applicable) to increase your contribution. 

Your support helps lay the foundation for a shelter that will stand strong no matter the weather.

Vision for the Future